October Blog.
Welcome to the October blog. We've been busy on the various projects, the pictures below will show the various works.
Vertidraining tees
Preparing the area for the 1st tee winter mat
Strimmimg 13th/15th mounds
Tree surgeons at the 11th populars
Mallinsons vertidraining fairways
Autumn leaves ready to fall.
November blog.
We will look to start bunker work throughout November with our aim to reduce the over hangs on the face and create a better shape to them. Leaf removal will increase as they start to fall.Lets hope for some dry periods throughout the month to allow us to complete the work.
No comments:
Post a Comment