Saturday 18 February 2017




Welcome to the January blog.

The weather throughout the month allowed us to complete our work programme. We had periods of frost, wind and rain with the course being heavy at times.

We used the mini digger to put in gravel bands at the right hand side of the 6th green to help to drain the area.

Aeration continued on the greens with the procore,followed up with a cut to tidy up the surfaces. The fairways also received a trim to give better definition and shape.

We used the pole saw to remove the lower branches off the trees, the trees look so much better giving them great shape and definition.

The pictures below show the various work throughout the month.











February Blog. 

We hope to use the soil reliever on the greens and tees and start top dressing the greens. We aim to turf drainage lines and start topping up bunkers, and edging paths. The start of the busy period is getting closer!!!!