We started the month with cold temperatures and steady amounts of rain,the temperature held us back feeding the greens but we managed to top dress the greens after procore aeration.

Mallinsons came in to vertidrain the fairways,this work was put on hold after a wet period and the last six  were finished off at the end of the month.

Greens were sprayed to retain plant health and disease resistance.

The pictures below show the work.









We hope to feed the greens and continue our program of top dressing throughout the April alongside course presentation.

Thursday 28 February 2019

February Blog

We saw fabulous weather throughout the month that allowed us to shape up the course and get some definition cutting done. The start of the month seen snow!!!!!!

Aeration was carried out on the greens and tees with top dressings carried out on the 2nd tee and 17th/ 14th green drainage work.

Below are a selection of pictures showing the works.






In March we hope to feed greens and tees start top dressing greens.

Thursday 31 January 2019

January Blog

Welcome to the January Blog.

We saw a brief period of sleet and snow but in general the weather was manageable  throughout the month, which allowed us to continue on various tasks. The pictures below show some of the work.












In February we hope to continue with aeration and start to put definition on the course with the mowers.