Monday, 1 May 2017



April blog update.
April has been a really cool and dry month with a rainfall figure of 16mm,this weather pattern as helped to dry the course up but on the downside not allowed the grass to kick in and it has held back sward density.We need the temperature to rise and a couple of showers to get everything moving

 ( Greenkeepers are rarely happy with the weather!!!!!!!!!)

Mallinsons came in to vertidrain the fairways,We applied a touch of water to the greens to wash the top dressing in.The sprayer was used applying conditioner and wetting agent to the greens which was also washed in.


Below are some pictures of our progress throughout the month.






May programme.

We hope to see a rise in temperature to aid growth, our top dressing applications will continue alongside aeration.Bunkers will be topped up with sand and cutting on all areas will increase.



Welcome to our March blog.


The early part of the month was very wet but we seen a change towards the latter part with a period of dry weather.

The cutting programme around the course was increased and the top dressing on the greens moved in to action. The increase in temperature enabled us to feed the greens and tees.

We aerated the greens with the procore and loosed the bunkers with the tiller.

The greens team worked on a landscape project which prepared an area near the club house to be used for photographs for weddings etc.

The pictures below show the various works.










Sunday, 30 April 2017



Welcome to our February blog. 


As usual the weather controlled the work programme with periods of rain and a visit from storm Doris that created additional work with the chainsaws.

We carried out deep aeration to the green, tees and walkways.The occasional dry spell allowed us to  pick up a little cutting on various areas.

The wet conditions held us back on applying our first top dressing to the greens

The pictures below shows some of the work throughout the month.








March work programme. 

We hope to start our top dressing on the greens,and our regular aeration work.
We will be starting to shape and cut areas ready for spring.

Saturday, 18 February 2017




Welcome to the January blog.

The weather throughout the month allowed us to complete our work programme. We had periods of frost, wind and rain with the course being heavy at times.

We used the mini digger to put in gravel bands at the right hand side of the 6th green to help to drain the area.

Aeration continued on the greens with the procore,followed up with a cut to tidy up the surfaces. The fairways also received a trim to give better definition and shape.

We used the pole saw to remove the lower branches off the trees, the trees look so much better giving them great shape and definition.

The pictures below show the various work throughout the month.











February Blog. 

We hope to use the soil reliever on the greens and tees and start top dressing the greens. We aim to turf drainage lines and start topping up bunkers, and edging paths. The start of the busy period is getting closer!!!!   

Saturday, 14 January 2017

December Blog

December Blog. 

Welcome to the December blog.

Our winter work programme continues with most of the bunker work being completed. We've recently purchased a AFT 45 trencher to be used on draining problem areas. It is a great piece of kit that will allow us to tap into existing drains around the course.

The weather throughout December was quite mild and damp with the occasional frosty spell.These conditions are ideal for the development of turf disease.

The most common disease at this time of the year is Fusarium Patch caused by Microdochium nivale. This Fungus attacks the grass plant and kills affected areas.It is most noticable on the greens but can attack all the other grass areas on the course.

The mild damp, humid, conditions in December have been ideal for the disease to attack the turf.To prevent the attack we apply a prevetative fungicide,but if the disease pressure is stronger than the chemical then an attack can take place.

Photographs below showing some of the points that's been discussed.

                                         Sprayer ready to apply a preventative Fungicide.

                                                                 Fusarium Patch
                                                               AFT  trencher

In January we hope to continue with  drainage work and start on cutting back low branches from around the trees.

November Blog




Welcome to our November blog. 

The weather allowed us to make a great start to our winter programme. We looked at shaping,draining and taking off the overhanging lips on selected bunkers.

Work was completed on taking out the small mounds on the 5th hole, the mound on the 1st hole and filling and turfing the small bunker on the 11th hole, The temporary tee on the 12th was taken out because it is no longer used and this area will be prepared ready for seeding.

Removing the leaves continued with no help from the wind, the majority just dropped and were removed off the course with the tractor mounted blower.

We continued our aeration on the greens and tees. The fairways were cut to give definition. The greens were sprayed with a preventative fungicide to control Fusarium patch which is a fungus that attacks fine turf. I will go into more detail in our December blog explaining the conditions that enable the disease to damage the turf.

Below are a selection of photographs showing some of the work that's been carried out.




                                                             6th Cross Bunker





                                                            2nd Greenside Bunker




                                                       Small mounds on the 5th hole.


We hope to continue with our programme throughout December, And as usual the weather will decide what order it is carried out in.

Saturday, 19 November 2016

October Blog.


Welcome to the October blog. We've been busy on the various projects, the pictures below will show the various works. 

 Vertidraining tees



Preparing the area for the 1st tee winter mat



Strimmimg 13th/15th mounds



 Tree surgeons at the 11th populars



Mallinsons vertidraining fairways



Autumn leaves ready to fall.


November blog.

We will look to start bunker work throughout November with our aim to reduce the over hangs on the face and create a better shape to them. Leaf removal will increase as they start to fall.Lets hope for some dry periods throughout the month to allow us to complete the work.