Monday 9 October 2017

September

September Blog.

We continue to discuss the unpredictable weather patterns as we head in to Autumn.

Historically September was regarded as a dry month where fairways could be scarified and deep aeration could be carried out that would benefit the course moving in to the winter period.
Unfortunately the continuous rainfall restricts the work from being carried out,and we look for windows of opportunity. We overseeded the greens in the early part of the month and saw good germination after ten days.

The mounds on the 13th /15th/17th were cut short and raked up. Later in the month we aerated the greens with the procore.

Photographs below show the various works.






October work programme.
We have discussed various projects for the winter programme, drainage on problem areas will be carried out and we will look to thin out heavily planted areas of trees that restrict  sun light  air flow  
 and cause root damage to the drains. 

We aim to allow the specimen trees to flourish by giving them space to develop. Over a period of time we will look at these correctly managed areas and see the long term benefits with areas drying out and the ground  surfaces becoming more playable throughout the year. We will target bunker maintenance on all the bunkers on the 7th hole,reducing overhangs improving drainage and positioning bunker mat. The bunker mat will improve sand quality and reduce contamination from existing soils.  